Classifieds Advertise Archive Subscriptions Family Announcements Photos Digital Editions/Apps
Connect with us

Connacht Tribune

Rail links to airports key for West’s future

Dara Bradley

Published

on

Minister Sean Kyne

Making Shannon and Knock airports accessible by train by reopening the Western Rail Corridor, and reclassifying Galway Harbour, are two objectives that should be included in the Ireland 2040 Plan, according to a Government minister.

Seán Kyne, Minister of State at the Department or Rural and Community Development, made the suggestions in a submission on the draft national planning framework.

He did so in his capacity as a TD for Galway West, he said, and his recommendations strive to achieve more connectivity in the West and regional balance in the plan.

Minister Kyne said the Western Rail Corridor “and its continued development must be included as a key point of ‘Accessibility to the North West’ in Ireland 2040 Plan.”

“The Western Rail Corridor, as it stands now, could, with minor investment, create the first rail-connected airport in the country: Shannon Airport. Similarly, a re-opened railway north of Athenry to Sligo could also improve the connectivity of Ireland West Knock Airport,” said Minister Kyne.

He also called for Galway Harbour to be reclassified in the interests of international connectivity.

The draft plan recognises the importance of Dublin, Cork and Shannon-Foynes but he believes Galway and Rosslare, have important roles to play in business terms.

“Galway, for example, is rail-connected and located in the city which makes it potentially one of the most attractive to the substantial tourism cruise sector as well as an option for freight. The current classification system has resulted in a significant stretch of coastline, for the West and North West, being left without a Tier 1 or Tier 2 port.

For more, read this week’s Connacht Tribune.

Connacht Tribune

Galway Real Estate have attractive site for sale on the Aran Islands

Avatar

Published

on

Oghill, Inishmore, Aran Islands.

Galway Real Estate have an attractive site/property for sale at Oghill, Inishmore, Aran Islands.

The site is approximately c.150 square metres. (c.1600 sq. ft.) on c.1 acre with planning permission to convert to a dwelling house and fit a new waste water treatment system. Planning Ref: 17/1284. There are two years  left on planning. The planning is for a proposed 4 bedrooms, kitchen, dining/room, laundry/room, bathroom. This is a wonderful opportunity to get a property ready to go. Offers in excess of €125,000 considered.

Full details from Paddy Flynn 0872557618 or Galway Real Estate on 091565488 or email: info@galwayrealestate.ie

Continue Reading

Connacht Tribune

Aran to welcome Ireland’s largest domestic passenger ferry

Avatar

Published

on

Saoirse na Farraige

The largest domestic passenger ferry in the country is making its journey from the Far East to the Far West – ready to commence service from Galway to the three Aran Islands.

The 40-metre ‘Saoirse na Farraige’ represents a massive investment – and vote of confidence – in island tourism on the part of the owners, Aran Island Ferries.

Commissioned in January 2019, this sixth member of their fleet has a capacity of 400 – and it is expected to arrive in Galway Bay from Hong Kong in October.

The vessel departed Hong Kong last week, embarking on a 2,500 mile journey to Galway Bay – inside the hold of a heavy lift ship called Svenja’”.

Saoirse na Farraige has at least three more stops to make before arriving in Galway Bay at the end of October – and it won’t not enter service until next spring.

Aran Island Ferries Sales and Marketing Manager, Aine McLoughlin, said that they were looking forward to seeing visitors enjoy their journey to the Aran Islands, enjoying the increased capacity, accessibility, and safety features.

“We are really looking forward to officially launching ‘Saoirse na Farraige’ next year and seeing visitors enjoy their journey to the Aran Islands on board our new ferry,” she said.

Saoirse na Farraige will serve all three islands from Rossaveel – with a journey time of 40 minutes to Inis Mór, 50 minutes to Inis Meáin, and 55 minutes to Inis Oírr.

Read the full story in this week’s Connacht Tribune, on sale in now – or download our digital edition at www.connachttribune.ie

Continue Reading

Connacht Tribune

Emergency Department upgrade will happen at UHG – but it’s complicated

Denise McNamara

Published

on

The current ED at UHG.

Revamping the emergency department at UHG will involve three separate projects – leading to the hospital’s chief describing the process as ‘very complex’.

City Councillor John Connolly (FF) said the people of Galway were concerned that the new emergency department – like the ring road – would never happen, as it appeared to be so bound up in red tape.

Joe Hoare, assistant national director of estates in HSE West, told the Regional Health Forum West meeting that that outpatients department adjacent to the emergency department was being redeveloped to create more capacity for streaming Covid patients from non-Covid patients for the winter.

The outpatients department would be relocated to the Merlin Park campus. The design for this building would be completed within ten months with construction expected to begin in by last 2021 at the earliest.

An interim emergency department was the next priority so that the current building could be knocked to make way for the new state-of-the-art building, creating a new maternity department and paediatrics unit.

Since the budget for the new children’s hospital had blown out of all proportion, the rules over public projects over €100 million had changed and the Saolta hospital group had to ensure its business case for the massive project was ‘watertight’.

Mr Hoare said all three projects were moving in parallel, including the enabling works for the main build, which would take around 18 months to complete.

He described the project as Saolta’s ‘absolute top priority and was regarded as such by the national HSE organisation.

Head of Saolta, Tony Canavan, said the project was ‘big and very complex’ and required management to remain ‘very focused over a long time’.

Read the full story in this week’s Connacht Tribune, on sale in now – or download our digital edition at www.connachttribune.ie

Continue Reading

Local Ads

Advertisement

Weather

Weather Icon
Advertisement

Facebook

Advertisement

Trending