Classifieds Advertise Archive Subscriptions Family Announcements Photos Digital Editions/Apps
Connect with us

Connacht Tribune

Mountbellew/Moylough rarely at full throttle in dismissing 14-man Killannin

Avatar

Published

on

Killannin's Ruairi Greene is challenged by Colin Ryan of Mountbellew/Moylough during Sunday's senior football quarter-final at Pearse Stadium. Photos: Joe O'Shaughnessy.

Mountbellew/Moylough 2-13

Killannin 1-5

JOHN FALLON AT PEARSE STADIUM

THERE was little demand on Val Daly’s Mountbellew/Moylough to show their full hand at Pearse Stadium on Sunday as they brushed aside the disappointing challenge of Killannin in a one-sided senior football championship quarter-final.

Killannin really couldn’t afford to have to chase this game but after losing the toss and having to face the wind, they were as good as gone by half-time when they trailed by 1-7 to 1-1 and were down to 14 men.

That meant that Mountbellew/Moylough just had to contain their advantage after the restart and they did this with considerable ease in a dismal contest full of ball being played back and forth across the pitch.

Killannin just could not mount a comeback with the elements but didn’t help their cause by laboured build-ups, and their task was near insurmountable when wing-back Ronan Caldwell was sent off for an off-the-ball tussle with Ger Donoghue just before the break.

The contest wasn’t helped by a lot of niggly fouling and play-acting by both sides and referee Ronan McNulty might have gone with a firmer hand but, in truth, Mountbellew/ Moylough’s dominance was never in doubt and the question that remains is how much they can now raise their game as they bid for a fourth final appearance in six seasons.

For more, read this week’s Connacht Tribune.

Get the Connacht Tribune Live app

The Connacht Tribune Live app is the home of everything that is happening in Galway City and county. It’s completely FREE and features all the latest news, sport and information on what’s on in your area. Click HERE to download it for iPhone and iPad from Apple’s App Store, or HERE to get the Android Version from Google Play.

 

 

Connacht Tribune

Galway Real Estate have attractive site for sale on the Aran Islands

Avatar

Published

on

Oghill, Inishmore, Aran Islands.

Galway Real Estate have an attractive site/property for sale at Oghill, Inishmore, Aran Islands.

The site is approximately c.150 square metres. (c.1600 sq. ft.) on c.1 acre with planning permission to convert to a dwelling house and fit a new waste water treatment system. Planning Ref: 17/1284. There are two years  left on planning. The planning is for a proposed 4 bedrooms, kitchen, dining/room, laundry/room, bathroom. This is a wonderful opportunity to get a property ready to go. Offers in excess of €125,000 considered.

Full details from Paddy Flynn 0872557618 or Galway Real Estate on 091565488 or email: info@galwayrealestate.ie

Continue Reading

Connacht Tribune

Aran to welcome Ireland’s largest domestic passenger ferry

Avatar

Published

on

Saoirse na Farraige

The largest domestic passenger ferry in the country is making its journey from the Far East to the Far West – ready to commence service from Galway to the three Aran Islands.

The 40-metre ‘Saoirse na Farraige’ represents a massive investment – and vote of confidence – in island tourism on the part of the owners, Aran Island Ferries.

Commissioned in January 2019, this sixth member of their fleet has a capacity of 400 – and it is expected to arrive in Galway Bay from Hong Kong in October.

The vessel departed Hong Kong last week, embarking on a 2,500 mile journey to Galway Bay – inside the hold of a heavy lift ship called Svenja’”.

Saoirse na Farraige has at least three more stops to make before arriving in Galway Bay at the end of October – and it won’t not enter service until next spring.

Aran Island Ferries Sales and Marketing Manager, Aine McLoughlin, said that they were looking forward to seeing visitors enjoy their journey to the Aran Islands, enjoying the increased capacity, accessibility, and safety features.

“We are really looking forward to officially launching ‘Saoirse na Farraige’ next year and seeing visitors enjoy their journey to the Aran Islands on board our new ferry,” she said.

Saoirse na Farraige will serve all three islands from Rossaveel – with a journey time of 40 minutes to Inis Mór, 50 minutes to Inis Meáin, and 55 minutes to Inis Oírr.

Read the full story in this week’s Connacht Tribune, on sale in now – or download our digital edition at www.connachttribune.ie

Continue Reading

Connacht Tribune

Emergency Department upgrade will happen at UHG – but it’s complicated

Denise McNamara

Published

on

The current ED at UHG.

Revamping the emergency department at UHG will involve three separate projects – leading to the hospital’s chief describing the process as ‘very complex’.

City Councillor John Connolly (FF) said the people of Galway were concerned that the new emergency department – like the ring road – would never happen, as it appeared to be so bound up in red tape.

Joe Hoare, assistant national director of estates in HSE West, told the Regional Health Forum West meeting that that outpatients department adjacent to the emergency department was being redeveloped to create more capacity for streaming Covid patients from non-Covid patients for the winter.

The outpatients department would be relocated to the Merlin Park campus. The design for this building would be completed within ten months with construction expected to begin in by last 2021 at the earliest.

An interim emergency department was the next priority so that the current building could be knocked to make way for the new state-of-the-art building, creating a new maternity department and paediatrics unit.

Since the budget for the new children’s hospital had blown out of all proportion, the rules over public projects over €100 million had changed and the Saolta hospital group had to ensure its business case for the massive project was ‘watertight’.

Mr Hoare said all three projects were moving in parallel, including the enabling works for the main build, which would take around 18 months to complete.

He described the project as Saolta’s ‘absolute top priority and was regarded as such by the national HSE organisation.

Head of Saolta, Tony Canavan, said the project was ‘big and very complex’ and required management to remain ‘very focused over a long time’.

Read the full story in this week’s Connacht Tribune, on sale in now – or download our digital edition at www.connachttribune.ie

Continue Reading

Local Ads

Advertisement

Weather

Weather Icon
Advertisement

Facebook

Advertisement

Trending