Classifieds Advertise Archive Subscriptions Family Announcements Photos Digital Editions/Apps
Connect with us

News

Anger over state of Western Distributor Road

Avatar

Published

on

A city councillor has blasted the City Council over the state of the Western Distributor Road in the wake of recent roadworks.

Cllr Colette Connolly said she was appalled at the quality of the roadworks and has written to the Director of Services Joe O’Neill to ask for action to be taken.

Cllr Connolly said she had received numerous representations from residents, and had contacted City Hall to complain about the works being carried out.

“Galway City Council maintain the works are being done to improve road safety for motorists and are NRA approved, but in fact because of the uneven application of the surface works particularly on the cycle lanes there is a risk to the health and safety of all road users,” she pointed out.

Cllr Connolly said she had walked the road and found the inconsistency of the application of the resurfacing inexplicable.

“In some areas it covers the cycle lane as it does on the approach to the Athy roundabout but not in other areas.  No machine was used to roll over and embed the surfacing leaving it to motorists to do it over time, which is totally unacceptable.

“Residents have tar on their tyres, which they are carrying home onto their driveways. This cannot be acceptable as motorists pay enough in taxes and insurance and should at least have the expectation that works will be carried out to a very high standard and that Galway City Council will ensure that this is so.”

Cllr Connolly said the most dangerous threat was that posed by the loose stone strewn everywhere on both sides of the cycle lanes making this a threat to the health and safety of cyclists and other all road users.

She said immediate action needed to be taken.

CITY TRIBUNE

Glass roof over Latin Quarter among raft of proposals to Galway City Council

Stephen Corrigan

Published

on

From this week’s Galway City Tribune – A proposal to put a roof over the Latin Quarter – with outdoor heaters to combat Galway’s changeable weather – is among a raft of suggestions that will be considered by the Council as it draws up the next City Development Plan.

The widespread use of outdoor theatre and extended opening hours for retail and cultural attractions are also on the cards as members of the public and lobby groups push for a city that offers the broadest range of tourist attractions.

As part of series of measures put forward to improve the outdoor offering in the city, one submission – which is understood to have been noted by the Council Chief Executive Brendan McGrath in his report on plan, which is at ‘pre-draft’ stage – is to put a glass ceiling on the city centre’s main commercial thoroughfares.

Planners are currently considering the proposal as part of more than 500 submissions made to Council in the first public consultation for the document, which will shape development in the city for six years after 2023.

It’s proposed that by covering the length of Quay Street/Latin Quarter in high retractable glass panes ‘mounted on decorative supports’, and installing street heaters, ‘a comfortable outdoor ambiance could be created’.

This is one of almost 50 submissions made in the area of economic development, where the theme of improving the city’s night-time economy and tourism offering feature prominently.

In another submission from Fáilte Ireland, the tourism authority expresses its desire that the next City Development Plan should have a chapter dedicated to tourism, such is its importance to the city’s economic success.

As well as developing Galway’s growing reputation as a ‘foodie destination’, developing the night-time economy is identified as being ‘an important aspect of ensuring a vibrant city centre and means more than just developing a bar and restaurant culture’.
This is a shortened preview version of this article. To read the rest of the story, see this week’s Galway City Tribune. You can buy a digital edition HERE.

Continue Reading

CITY TRIBUNE

100 new jobs for Galway City Sports Direct outlet

Denise McNamara

Published

on

From this week’s Galway City Tribune – The Sports Direct retail giant is set to create up to 100 new jobs when it takes over the former Debenhams department store in the Corrib Shopping Centre.

And the company’s sister outlet Heatons looks set to make a return to the city – possibly in the same building, although management are remaining tight-lipped.

Sports Direct has taken a lease on the Debenhams premises, which has been vacant since before the pandemic, and it will open in June.

“The 65,000 sq ft store will comprise four floors and will consist of Sports Direct, USC and Brand Max. 100 jobs for the store will be created,” a spokesperson confirmed to the Galway City Tribune.

The spokesperson could not confirm that the Heatons brand – which is also owned by English billionaire Mike Ashley – will also be opening as part of the move. The group is currently advertising for staff to work at a new Heatons store in Galway.
This is a shortened preview version of this article. To read the rest of the story, see this week’s Galway City Tribune. You can buy a digital edition HERE.

Continue Reading

CITY TRIBUNE

Forty firefighters tackle major blaze at Galway golf shop

Francis Farragher

Published

on

From this week’s Galway City Tribune – Up to 40 firefighters from across the city and county fought a major fire at the GolfStyle superstore off the Tuam Road for around six hours on Thursday morning.

Gardaí on routine patrol in the Liosbán Business Park shortly before 3am noticed smoke coming from the roof of the building and immediately alerted the fire service.

The building, which was unoccupied at the time, is understood to have suffered major structural and roof damage in the fire that started in the first floor.

At one point, 11 fire engines from the city, Athenry, Loughrea, Carraroe and Gort fought the blaze, using water tankers and aerial ladders, as well as having a command unit in place.

Firemen equipped with breathing apparatus also had to force their way into the building to tackle the source of the fire, that possibly could have been caused by an electrical problem.

The fire was brought under control at around 7.30am, but the Fire Brigade remained at the scene for a number of hours afterwards in case of any secondary outbreak.
This is a shortened preview version of this article. To read the rest of the story, see this week’s Galway City Tribune. You can buy a digital edition HERE.

Continue Reading

Local Ads

Local Ads

Advertisement
Advertisement

Facebook

Advertisement

Trending